The notorious Arma17’s event at The Arsenal Factory in St. Petersburg had never happened — was stopped by the powers — but it was supposed to take place in the unique historical place, the manufactory of Gun Caster founded by Peter The Great in 1711.
We had just a week to install the decorations and interior at the area of 1000 m2: the 2nd floor dancefloor with a minibar, and the 3rd floor wine hall + seating zone. The challenge was mostly acoustic: closed space lined with ceramic tiles, where sound is reflected from all the surfaces, and the height of the ceiling aggravating the acoustic problem.
Tasks:
— Soundproofing and acoustic decisions for the dance floor.
— Creating a visual effect of a water pool in Soviet aesthetics.
— Creating the comfortable logistic system between floors and other stages.
Arma17
2017